Deliverable Factors of Manpower Requirement Plan: An Evidence from Indian EPC Company

Amruth Gurudev S, Srinivasa Rao Potti, Shiva Prasad H C

Research output: Contribution to journalArticle

Abstract

This paper discusses the manpower plan required, and their deliverables factors to the clients of an Engineering Procurement and Construction in the process of designing for the construction of a thermal power plant, analyses the resource usage versus the planned allocated scheduled resources, resource levelling of scheduling. As a part of resource availability constraints in a critical path, method calendars were used to postpone activity start time, extend the activity duration that resulted in an increase of the project duration. A method of a forward pass has been proposed with the help of the S-curve diagram interpretation with the application of DMADV approach for resource levelling is illustrated with an activity-on-node as a case and a precedence diagram method. This research has elucidated on the critical issues of resource constrained levelling in the application domain of the project management in anticipation of deliverables from its employees to an EPC company. The findings of this research would provide useful inputs for the vendors and the consulting firm.
Original languageEnglish
Article number14
Pages (from-to)1631-1636
Number of pages5
JournalInternational Journal of Engineering and Technology
Volume09
Issue number03
DOIs
Publication statusPublished - 12-06-2017

Fingerprint

Project management
Industry
Power plants
Scheduling
Availability
Personnel
Factors
Resources
Hot Temperature
Leveling
Diagrams

All Science Journal Classification (ASJC) codes

  • Business, Management and Accounting(all)

Cite this

Gurudev S, Amruth ; Rao Potti, Srinivasa ; Prasad H C, Shiva. / Deliverable Factors of Manpower Requirement Plan: An Evidence from Indian EPC Company. In: International Journal of Engineering and Technology. 2017 ; Vol. 09, No. 03. pp. 1631-1636.
@article{cdfe57c6e6dd44328b5c37e23ce0e2af,
title = "Deliverable Factors of Manpower Requirement Plan: An Evidence from Indian EPC Company",
abstract = "This paper discusses the manpower plan required, and their deliverables factors to the clients of an Engineering Procurement and Construction in the process of designing for the construction of a thermal power plant, analyses the resource usage versus the planned allocated scheduled resources, resource levelling of scheduling. As a part of resource availability constraints in a critical path, method calendars were used to postpone activity start time, extend the activity duration that resulted in an increase of the project duration. A method of a forward pass has been proposed with the help of the S-curve diagram interpretation with the application of DMADV approach for resource levelling is illustrated with an activity-on-node as a case and a precedence diagram method. This research has elucidated on the critical issues of resource constrained levelling in the application domain of the project management in anticipation of deliverables from its employees to an EPC company. The findings of this research would provide useful inputs for the vendors and the consulting firm.",
author = "{Gurudev S}, Amruth and {Rao Potti}, Srinivasa and {Prasad H C}, Shiva",
year = "2017",
month = "6",
day = "12",
doi = "10.21817/ijet/2017/v9i3/170903005",
language = "English",
volume = "09",
pages = "1631--1636",
journal = "International Journal of Engineering and Technology",
issn = "2319-8613",
publisher = "Engg Journals Publications",
number = "03",

}

Deliverable Factors of Manpower Requirement Plan: An Evidence from Indian EPC Company. / Gurudev S, Amruth; Rao Potti, Srinivasa; Prasad H C, Shiva.

In: International Journal of Engineering and Technology, Vol. 09, No. 03, 14, 12.06.2017, p. 1631-1636.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Deliverable Factors of Manpower Requirement Plan: An Evidence from Indian EPC Company

AU - Gurudev S, Amruth

AU - Rao Potti, Srinivasa

AU - Prasad H C, Shiva

PY - 2017/6/12

Y1 - 2017/6/12

N2 - This paper discusses the manpower plan required, and their deliverables factors to the clients of an Engineering Procurement and Construction in the process of designing for the construction of a thermal power plant, analyses the resource usage versus the planned allocated scheduled resources, resource levelling of scheduling. As a part of resource availability constraints in a critical path, method calendars were used to postpone activity start time, extend the activity duration that resulted in an increase of the project duration. A method of a forward pass has been proposed with the help of the S-curve diagram interpretation with the application of DMADV approach for resource levelling is illustrated with an activity-on-node as a case and a precedence diagram method. This research has elucidated on the critical issues of resource constrained levelling in the application domain of the project management in anticipation of deliverables from its employees to an EPC company. The findings of this research would provide useful inputs for the vendors and the consulting firm.

AB - This paper discusses the manpower plan required, and their deliverables factors to the clients of an Engineering Procurement and Construction in the process of designing for the construction of a thermal power plant, analyses the resource usage versus the planned allocated scheduled resources, resource levelling of scheduling. As a part of resource availability constraints in a critical path, method calendars were used to postpone activity start time, extend the activity duration that resulted in an increase of the project duration. A method of a forward pass has been proposed with the help of the S-curve diagram interpretation with the application of DMADV approach for resource levelling is illustrated with an activity-on-node as a case and a precedence diagram method. This research has elucidated on the critical issues of resource constrained levelling in the application domain of the project management in anticipation of deliverables from its employees to an EPC company. The findings of this research would provide useful inputs for the vendors and the consulting firm.

U2 - 10.21817/ijet/2017/v9i3/170903005

DO - 10.21817/ijet/2017/v9i3/170903005

M3 - Article

VL - 09

SP - 1631

EP - 1636

JO - International Journal of Engineering and Technology

JF - International Journal of Engineering and Technology

SN - 2319-8613

IS - 03

M1 - 14

ER -