Feasibility of a powder coating process inside indian paint’s company through VSM approach

Nithin Rajappa, Srinivasa Rao Potti, Giridhar B. Kamath, H. C. Shiva Prasad

Research output: Contribution to journalArticle

Abstract

Paint manufacturing industries in common are facing yield loss and poor quality of the products that has led to low productivity, longer production lead time, rework and rejection. The focus is on the efficiency of the plant, and these factors will reduce the overall efficiency of the plant. The purpose of the study is to implement a lean tool that is Value Stream Mapping. The objective is to identify the waste and eliminate them in the plant. For collecting the information required to complete the project, the researcher will take a tour to the shop floor which will enable the researcher to be familiar with the activities that are taking place, and this will help in getting a vague idea about the process and the production flow. The result obtained was observed, and suitable suggestions were proposed to overcome the problems that the industry is facing.

Original languageEnglish
Pages (from-to)141-146
Number of pages6
JournalInternational Journal of Recent Technology and Engineering
Volume7
Issue numberICETESM18
Publication statusPublished - 01-03-2019

Fingerprint

Powder coatings
Paint
Industry
Productivity
Manufacturing industries
Shopfloor
Factors
Lead time
Rework
Value stream mapping

All Science Journal Classification (ASJC) codes

  • Engineering(all)
  • Management of Technology and Innovation

Cite this

Rajappa, Nithin ; Potti, Srinivasa Rao ; Kamath, Giridhar B. ; Shiva Prasad, H. C. / Feasibility of a powder coating process inside indian paint’s company through VSM approach. In: International Journal of Recent Technology and Engineering. 2019 ; Vol. 7, No. ICETESM18. pp. 141-146.
@article{3bef7b050e2c4c5894c59fdf33353d52,
title = "Feasibility of a powder coating process inside indian paint’s company through VSM approach",
abstract = "Paint manufacturing industries in common are facing yield loss and poor quality of the products that has led to low productivity, longer production lead time, rework and rejection. The focus is on the efficiency of the plant, and these factors will reduce the overall efficiency of the plant. The purpose of the study is to implement a lean tool that is Value Stream Mapping. The objective is to identify the waste and eliminate them in the plant. For collecting the information required to complete the project, the researcher will take a tour to the shop floor which will enable the researcher to be familiar with the activities that are taking place, and this will help in getting a vague idea about the process and the production flow. The result obtained was observed, and suitable suggestions were proposed to overcome the problems that the industry is facing.",
author = "Nithin Rajappa and Potti, {Srinivasa Rao} and Kamath, {Giridhar B.} and {Shiva Prasad}, {H. C.}",
year = "2019",
month = "3",
day = "1",
language = "English",
volume = "7",
pages = "141--146",
journal = "International Journal of Recent Technology and Engineering",
issn = "2277-3878",
publisher = "Blue Eyes Intelligence Engineering and Sciences Publication",
number = "ICETESM18",

}

Rajappa, N, Potti, SR, Kamath, GB & Shiva Prasad, HC 2019, 'Feasibility of a powder coating process inside indian paint’s company through VSM approach', International Journal of Recent Technology and Engineering, vol. 7, no. ICETESM18, pp. 141-146.

Feasibility of a powder coating process inside indian paint’s company through VSM approach. / Rajappa, Nithin; Potti, Srinivasa Rao; Kamath, Giridhar B.; Shiva Prasad, H. C.

In: International Journal of Recent Technology and Engineering, Vol. 7, No. ICETESM18, 01.03.2019, p. 141-146.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Feasibility of a powder coating process inside indian paint’s company through VSM approach

AU - Rajappa, Nithin

AU - Potti, Srinivasa Rao

AU - Kamath, Giridhar B.

AU - Shiva Prasad, H. C.

PY - 2019/3/1

Y1 - 2019/3/1

N2 - Paint manufacturing industries in common are facing yield loss and poor quality of the products that has led to low productivity, longer production lead time, rework and rejection. The focus is on the efficiency of the plant, and these factors will reduce the overall efficiency of the plant. The purpose of the study is to implement a lean tool that is Value Stream Mapping. The objective is to identify the waste and eliminate them in the plant. For collecting the information required to complete the project, the researcher will take a tour to the shop floor which will enable the researcher to be familiar with the activities that are taking place, and this will help in getting a vague idea about the process and the production flow. The result obtained was observed, and suitable suggestions were proposed to overcome the problems that the industry is facing.

AB - Paint manufacturing industries in common are facing yield loss and poor quality of the products that has led to low productivity, longer production lead time, rework and rejection. The focus is on the efficiency of the plant, and these factors will reduce the overall efficiency of the plant. The purpose of the study is to implement a lean tool that is Value Stream Mapping. The objective is to identify the waste and eliminate them in the plant. For collecting the information required to complete the project, the researcher will take a tour to the shop floor which will enable the researcher to be familiar with the activities that are taking place, and this will help in getting a vague idea about the process and the production flow. The result obtained was observed, and suitable suggestions were proposed to overcome the problems that the industry is facing.

UR - http://www.scopus.com/inward/record.url?scp=85067929443&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85067929443&partnerID=8YFLogxK

M3 - Article

VL - 7

SP - 141

EP - 146

JO - International Journal of Recent Technology and Engineering

JF - International Journal of Recent Technology and Engineering

SN - 2277-3878

IS - ICETESM18

ER -